|

Storm Sewer System Construction
|
|
The city of Norman is installing a new storm sewer
system near the junction of Lindsey and Elm streets to avoid future flooding.
The sewer system is designed to discharge a capacity of 7.5 ft3/s
when the pipe flows at 80% full, as shown in the figure. The slope
of the sewer is 0.003. |